Second Manapouri Tailrace Tunnel
Completion Date:
2002
Project Details:
This 10 metre wide 10 kilometre tail race tunnel was completed in 2002 to increase the efficiency of the Manapouri Power Scheme.
Fletchers Dillingham and Ilbau the Joint Venture partners contracted to build the project selected Rockbond Form Release (7.18) as the release agent used in the state-of-art continuous poured concrete tunnel lining.
Key Products Used:
Project Partners:
Fletchers Dillingham and Ilbau Joint Venture
ROCKBOND
Freephone
0800 76 25 26
Phone
04 568 5401
Email
sales@rockbond.co.nz
Address
7 Te Puni Street, Petone
PO Box 38 526
Wellington 5045
Level 2/40 Lady Elizabeth Lane
Wellington Central
Wellington 6011
43 Poturi Street
Tauriko
Tauranga 3110
ENQUIRE
DON'T MISS OUT!
Sign up for Rockbond's Monthly e-Newsletter for the latest news, products, and projects.











