Northland Train Line, NZ

Completion Date: 

2020

Project Details: 

Throughout 2020, significant improvements were carried out on the Northland Train Line between Auckland and Whangarei.

Rail helps reduce overall transport emissions, given each tonne of freight carried by rail has 70 per cent fewer emissions than that carried by road.

There are 13 tunnels on the Northland Line that needed repairs, with some of the tunnels needing to have the tracks lowered so that the shipping containers didn’t hit the walls of the Pre-1900 heritage tunnels as the trains went through. There were also a lot of bridges that needed replacing & repairing along the line.

Due to being well over 100 years old, the tunnels needed a good steel of structural strengthening and repair to bring them up to speed.

Rockbond worked with Groundfix, HEB & Geotech to provide structural repair solutions, including our 1.02 Dry-Spray Concrete (Gunite), which was used for structural repairs throughout the tunnels. Rockbond’s 6.15 Super Plasticiser was also used to pump the rock bolt grout over long distances, with the longest tunnels being over half a kilometre long.

Key Products Used:

Project Partners: 

  • Groundfix
  • HEB Construction
  • Geotech

ROCKBOND

Freephone
0800 76 25 26
Phone
04 568 5401
Email
sales@rockbond.co.nz

Address
7 Te Puni Street, Petone
PO Box 38 526
Wellington 5045


ENQUIRE

DON'T MISS OUT!

Sign up for Rockbond's Monthly e-Newsletter for the latest news, products, and projects.

ROCKBOND

Freephone
0800 76 25 26
Phone
04 568 5401
Email
sales@rockbond.co.nz

Address
7 Te Puni Street, Petone
PO Box 38 526
Wellington 5045


ENQUIRE

DON'T MISS OUT!

Sign up for Rockbond's Monthly e-Newsletter for the latest news, products, and projects.