Helensville Waste Water Treatment Plant

Completion Date:

November 2022

Project Details:

Throughout October and November 2022, Rockbond worked with John and the team from JEC Solutions on the Helensville Waste Water Treatment Plant pond remediation in North Auckland.

Over 4000 of Rockbond’s Culvert Bags were supplied into this project to build up the walls around the main pond so that the pond didn’t over flow in peak times. The culvert bags were a very cost effective way of lifting the side walls of the pond without having to do consented concrete works.

As well as this Rockbond Waterproof Mortar and Shield HP were used to remediate the existing concrete pond edges where concrete cracks and voids were filled to bring the concrete back up to standard.

Roockbond’s Culvert Bags, which achieve 40MPA within 7 days when just left in the weather, are an excellent way of strengthening embankments or building retaining walls.

The culvert bags themselves are an environmentally-friendly paper which over time breaks down and disappears leaving a solid grout structure.

Rockbond are involved in a wide range of remediation solutions in the water and waste water treatment industries and have a number of different products to meet all remediation applications.

Key Products Used:

5.9 Culvert Bags
4.01 Underwater Mortar
2.26 Shield HP

Project Partners: 

JEC Solutions

ROCKBOND

Freephone
0800 76 25 26
Phone
04 568 5401
Email
sales@rockbond.co.nz

Address
7 Te Puni Street, Petone
PO Box 38 526
Wellington 5045

Level 2/40 Lady Elizabeth Lane
Wellington Central
Wellington 6011

43 Poturi Street
Tauriko
Tauranga 3110


ENQUIRE

DON'T MISS OUT!

Sign up for Rockbond's Monthly e-Newsletter for the latest news, products, and projects.

ROCKBOND

Freephone
0800 76 25 26
Phone
04 568 5401
Email
sales@rockbond.co.nz

Address
7 Te Puni Street, Petone
PO Box 38 526
Wellington 5045

ENQUIRE

DON'T MISS OUT!

Sign up for Rockbond's Monthly e-Newsletter for the latest news, products, and projects.