Rockbond
  • HOME
  • CONSTRUCTION
  • PRECAST
  • PROJECTS
  • SPEC DOWNLOADS
  • ABOUT US
  • CONTACT US
Select Page

 

Rockbond SCP

Trading Hours
Monday - Friday
7.00am - 5.00pm

Freephone 0800 76 25 26
Phone 04 568 5401
Fax 04 568 4580

Office Address
7 Te Puni Street, Petone
Wellington 5012

Postal Address
PO Box 38 526
Wellington 5045

 

 

 

Quick Links

Home

Construction

Precast

Projects

About Us

Construction Product Guide Download

Ready-Mix Product Guide Download

Credit Application Download

 

 

 

© Rockbond 2018 | All Rights Reserved

Project Name: One Market Lane Apartments, NZ

Completion Date: January 2016

Key Products Used:

  • RB 7.10 Slabcure
  • RB 7.27 Evaporation Retarder

Project Details: 11 level building consisting of mix between office space and luxury apartments

Project Partners:

L.T. McGuinness

Project Name: Mercury Energy Tunnel, Auckland NZ

Completion Date: July 2002

Key Products Used:

  • RB 4.01 Underwater Mortar

Project Details: Construction of 9 km tunnel from Penrose to central Auckland containing two new 110 kV cables.

Project Partners:

  • Vector

 

Project Name: Methanol Plant Taranaki, NZ

Completion Date: 2013

Key Products Used:

  • RB 7.18 Form Release
  • RB 7.10 Slabcure

Project Details: Upgrading and restarting of mothballed Methanol plant.

Project Partners:

Fulton Hogan Civil

Project Name: 2nd Manapouri Tail race Tunnel

Completion Date: 2002

Key Products Used:

  • RB 7.18 Form Release

Project Details: 10 metre wide 10 kilometre 2nd tail race tunnel to increase the efficiency of the Manapouri Power Scheme

Project Partners:

  • Fletchers Dillingham and Ilbau Joint Venture

Project Name: Chaffers Apartments, Wellington NZ

Completion Date: January 2014

Key Products Used:

  • RB 7.30 Bio-Lease
  • RB 7.10 Slabcure
  • RB 7.27 Evaporation Retarder
  • RB 7.17 Surface Retarder Plus

Project Details:

Former Overseas terminal converted into top quality apartments with underground car park below sea level.

Project Partners:

L.T. McGuinness

Project Name: Arras Tunnel, Wellington NZ

Completion Date: September 2014

Key Products Used:

  • RB 7.30 Bio-lease,
  • RB 7.17 Surface Retarder Plus
  • RB 7.27 Evaporation Retarder
  • RB 7.23 Vertical Surface Retarder Plus
  • RB 10.13 Crete-Wash.

 

Project Details: A cut and cover tunnel built to go under the Wellington War Memorial Park.

Project Partners: Memorial Park Alliance

Project Name: Massey University – Ag Research Building

Key Products Used:

  • RB 7.17 Surface Retarder Plus
  • RB 7.23 Vertical Surface Retarder Plus

 

Project Details: New Building for Massey University Ag Research

Project Partners: McMillan & Lockwood PN Ltd

Project Name: Hutt Waste Water Treatment Plant, NZ

Completion Date: 2002

Key Products Used:

  • RB 7.11 Membrane Cure

Project Details: Waste water treatment plant treating up to 53 million litres daily, servicing around 146,000 residents and a large number of local industries.

Project Partners: Fletcher Construction Ltd

Project Name: Transmission Gully Motorway, Wellington NZ

Completion Date: 2020

Key Products Used:

  • RB 7.17EX Surface Retarder Plus EXTRA
  • RB 7.27 Evaporation Retarder
  • RB 7.18 Form Release
  • RB 7.23 Vertical Surface Retarder Plus
  • RB 8.04 Epoxy Mortar
  • RB 1.04 GP Grout Plus
  • RB 1.01 Repair Mortar

Project Details: A 27 km four-lane motorway north of Wellington incorporating 29 new bridges.

Project Partners:

  • CBP HEB Joint Venture
  • Silverstrand
  • Construction Contracts Ltd
  • Geovert

Project Name: Forsyth Barr Stadium, Dunedin NZ

Completion Date: August 2015

Key Products Used: 

  • RB 7.11 Membrane Cure
  • RB 7.17 Surface Retarder Plus
  • RB 7.18 Form Release

Project Details: Construction of New Zealand largest fully covered stadium.

Project Partners: Amalgamated Builders Dunedin Ltd.

Project Name: Huntsbury Water Reservoir, Christchurch NZ

Completion Date: November 2012

Key Products Used:

  • RB 7.10 Slabcure
  • RB 7.18 and Form Release

Project Details: Post Earthquake Reservoir Repair

Project Partners: Fulton Hogan Civil South

Project Name: M2PP Expressway, Kapiti NZ

Completion Date: February 2017

Key Products Used:

  • RB 7.11 Membrane Cure
  • RB 7.17 Surface Retarder Plus
  • RB 7.18 Form Release
  • RB 7.30 Bio-lease

 

Project Details:  18 km Expressway bypassing Kapiti Coast townships incorporating 18 new bridges.

Project Partners: McKays to Peka Peka Alliance

Project Name: Mcduff Marine Aquarium, UK

Key Products Used:

Project Details:

Project Partners:

Project Name: Brixham Harbour UK

Key Products Used:

Project Details:

Project Partners:

Project Name: Sizewell Power Station UK

Key Products Used:

Project Details:

Project Partners:

Project Name: Southend Pier UK

Key Products Used:

Project Details:

Project Partners:

Project Name: Greene King Brewery UK

Key Products Used:

Project Details:

Project Partners:

Project Name: Jersey Port, UK

Key Products Used:

Project Details:

Project Partners:

Project Name: Heathrow Airport, UK

Key Products Used:

Project Details:

Project Partners:

Project Name: House of Parliament, UK

Key Products Used:

Project Details:

Project Partners:

Project Name: Puhoi Tunnels NZ

Completion Date: January 2009

Key Products Used:

Project Details:

Project Partners:

Project Name: Wellington NZ, inner city bypass

Completion Date: March 2007

Key Products Used:

Project Details:

Project Partners:

Project Name: Wembly Stadium UK

Completion Date: March 2007

Key Products Used:

Project Details:

Project Partners:

Project Name: Island Bay Seawall Repair

Completion Date: December 2012

Key Products Used:

RB 1.01 Repair Mortar
RB 7.04 Fairing Coat

Project Details:

This project is a great example of how RB 7.04 Fairing Coat can bring old concrete up like brand new! RB 7.04 Fairing Coat is the ideal product for covering repairs to concrete so that no one can tell that repairs have been carried out.

In this particular project, Fulton Hogan did initial structural repairs to the seawall with RB 1.01 Repair Mortar and then applied RB 7.04 Fairing Coat to the entire wall bring it up like new.

RB 7.04 is specially formulated to match new concrete and incorporates a powder latex which means there is no need to prime the surface you are finishing.

Project Partners:

Fulton Hogan

As Key Account Manager for Rockbond I’m responsible for making sure that our valued clients and engineers are getting the service that they deserve, and for providing solutions to fulfil their ever changing requirements. I’m very passionate about concrete and excited about the way our company is heading. We have a great product range and a fantastic team that is committed to providing innovative yet cost effective solutions to the concrete construction industry.

As Operations Team Leader for Rockbond I’m totally committed to our Company Vision of being the preferred supplier to our clients. With Customer Service being our top priority, Rockbond’s Operations Team are committed to getting the right products to our clients on time every time!

For the past 20 years I have been dedicated to providing concrete solutions for a wide range of construction challenges. My team and I, have striven to keep pace with concrete technology and deliver “cutting edge” product lines to a customer base that has come to expect service that is second to none. In a rapidly changing marketplace our vision is to see Rockbond as the supplier of choice to the concrete industry.